Inner Mongolia’s 2 GW Alxa-to-Wuhai Renewable Project Connects to the Grid
The 2 GW Alxa-to-Wuhai regional renewable project in Inner Mongolia, including 1.7 GW of solar, 300 MW of wind and 300 MW/600 MWh of storage, achieved first grid connec…
The Shaanxi Investment Baishui 130 MW mountain solar plant, with 156.38 MWp installed and designed by China United Northwest Institute, has connected to the grid and is expected to generate about 197.6 GWh a year across sites in four towns.
According to SolarPanelsLink, the Shaanxi Investment Baishui 130 MW solar project, delivered by China United Northwest Institute, has been connected to the grid. Rated capacity is 130 MW with 156.38 MWp installed, making it one of the larger centralized mountain solar plants in Baishui county, Weinan, Shaanxi.
The plant is in Baishui county and covers sites in Leiya, Xigu, Shiguan and Yaohe towns. Each block steps up through box transformers and feeds nearby 35 kV overhead collection lines; five 35 kV circuits connect to a new 110 kV substation, which delivers to the 110 kV side of the Baishui Yaohe 330 kV collection station.
At 130 MW rated and 156.38 MWp installed, the DC/AC ratio is about 1.203.
Create a free account to read a longer preview. Full project reports and procurement detail are available to Pro and Business members.
Unlock procurement structure, tariff benchmarks, delivery status and live supply opportunities for this project.
The 2 GW Alxa-to-Wuhai regional renewable project in Inner Mongolia, including 1.7 GW of solar, 300 MW of wind and 300 MW/600 MWh of storage, achieved first grid connec…
The first 700 MW solar phase of CNNC Huaneng’s 1.6 GW Jinta clean energy base in Gansu has connected to the grid, the first Gansu project in China’s third batch of larg…
The 100 MW concentrated solar power unit of China Green Development’s 1 GW Fukang base in Xinjiang reached full load on 20 November, 21 days after first grid connection…