Inner Mongolia’s 2 GW Alxa-to-Wuhai Renewable Project Connects to the Grid
The 2 GW Alxa-to-Wuhai regional renewable project in Inner Mongolia, including 1.7 GW of solar, 300 MW of wind and 300 MW/600 MWh of storage, achieved first grid connec…
China Resources Power has completed its 225 MW Qingkou salt field fishery-solar project in Lianyungang, built on about 4,000 mu of leased pond water surface with average annual grid feed-in of about 347 GWh.
According to SolarPanelsLink, on 27 November China Resources Power's 225 MW Qingkou salt field fishery-solar project was completed.
The project is invested by Lianyungang Runtou Qingkou Energy Co Ltd on about 4,000 mu of leased pond water surface at the Qingkou salt field, building the solar array and a booster station. Average annual grid feed-in is about 347.07 GWh.
At 225 MW on 4,000 mu, capacity density is about 56.3 kW per mu, and on 347.07 GWh the utilisation hours are about 1,543.
Create a free account to read a longer preview. Full project reports and procurement detail are available to Pro and Business members.
Unlock procurement structure, tariff benchmarks, delivery status and live supply opportunities for this project.
The 2 GW Alxa-to-Wuhai regional renewable project in Inner Mongolia, including 1.7 GW of solar, 300 MW of wind and 300 MW/600 MWh of storage, achieved first grid connec…
The first 700 MW solar phase of CNNC Huaneng’s 1.6 GW Jinta clean energy base in Gansu has connected to the grid, the first Gansu project in China’s third batch of larg…
Sinohydro Bureau 9 has completed acceptance of 17 solar projects totalling 1,135 MW across Jinghong, Menghai and Mengla in Xishuangbanna, Yunnan, including five 220 kV …