Panamint Closes First US$769m Tranche for 1.2 GWdc Big Rooter Power in Texas
Panamint Capital has closed the first US$769 million tranche of an US$1.8 billion loan for the 1.2 GWdc Big Rooter Power solar project, to be built on its Twin Oaks sit…
Tesla has applied to Texas for JETI tax incentives on an estimated USD 3.1 billion solar-grade polysilicon plant near Robstown in Nueces County, with construction planned for 2027 to 2030 and production from 2030, alongside a USD 10.1 billion ingot, wafer and cell site near Richmond.
According to SolarPanelsLink, Tesla’s polysilicon project has taken another step forward.
On 18 November 2026 Tesla filed a JETI (Jobs, Energy, Technology and Innovation) tax incentive application with the Texas Comptroller’s office, disclosing plans to invest about USD 3.1 billion in a plant producing high-purity solar-grade polysilicon near Robstown in Nueces County.
Tesla has not previously been involved in polysilicon production. Between 2014 and 2020 the company ran solar cell and module operations through SolarCity and Gigafactory 2 in Buffalo, New York, working with Panasonic, and always bought its polysilicon upstream.
Create a free account to read a longer preview. Full project reports and procurement detail are available to Pro and Business members.
Unlock procurement structure, tariff benchmarks, delivery status and live supply opportunities for this project.
Panamint Capital has closed the first US$769 million tranche of an US$1.8 billion loan for the 1.2 GWdc Big Rooter Power solar project, to be built on its Twin Oaks sit…
Avantus has signed 20-year PPAs with PG&E for the first two phases of its Buttonbush solar centre in Kern County, California, covering 800 MW of solar and 3,200 MWh of …
Duke Energy Florida has filed regulatory applications for four new solar facilities totalling 300 MW in Orange and Sumter counties, a portfolio expected to save custome…